F-GAS REGULATION 2015 · ENERGY PERFORMANCE OF BUILDINGS REGULATIONS 2012 · SFG20 · GAS SAFE

Heating, ventilation and cooling from firms that specialise rather than generalise

HVAC is the line most often bundled into a general FM contract and least often checked. TM44 inspections lapse, F-Gas logs are incomplete, and ductwork has not been surveyed since handover. The desk matches you to firms with the specific registration for the asset, and prices planned maintenance against SFG20 rather than a made-up schedule.

HVAC compliance illustration
WHO CARRIES THE DUTY

Who is legally responsible

The building owner or operator, with the person in control of an air conditioning system responsible for TM44 inspections, and the operator of equipment containing fluorinated gases responsible for leak checking and record keeping.

THE LAW

What the regulations require

F-Gas Regulation (EU 517/2014, retained)

Leak checking intervals by CO2 equivalent charge, mandatory record keeping, and certified personnel for any work on the refrigerant circuit.

Energy Performance of Buildings (England and Wales) Regulations 2012

TM44 air conditioning inspection every five years for systems with effective rated output over 12kW.

Gas Safety (Installation and Use) Regulations 1998

Gas Safe registration required for work on commercial gas appliances and plant.

SFG20

The industry standard maintenance specification, the benchmark for what a planned maintenance contract should actually contain.

BS EN 15780 / TR19

Ventilation duct cleanliness standards, and the grease hygiene standard for kitchen extract.

SCOPE

What the hvac panel covers

TM44 air conditioning inspection

EVERY FIVE YEARS FOR SYSTEMS OVER 12KW

An accredited energy assessor inspects the system, lodges the report on the central register and issues efficiency recommendations. Non-lodgement carries a fixed penalty.

F-Gas leak testing and record keeping

EVERY 12, 6 OR 3 MONTHS DEPENDING ON CO2 EQUIVALENT CHARGE

Leak checks by certified engineers with a compliant equipment log, which is the record an enforcement visit asks to see first.

Ventilation and duct hygiene

RISK-BASED, KITCHEN EXTRACT COMMONLY THREE TO TWELVE MONTHLY UNDER TR19

Pre and post-clean verification to BS EN 15780 or TR19 Grease, with photographic and deposit-thickness evidence your insurer will accept.

Planned preventative maintenance

CONTINUOUS, TO AN SFG20-BASED SCHEDULE

Boiler, chiller, AHU and plant servicing priced against a defined task set rather than a vague annual visit.

VETTING

Accreditation the desk checks for

REFCOM F-Gas certifiedBESA memberGas Safe registered (commercial)CIBSE accredited TM44 assessorNADCA / TR19 for duct cleaning
  • REFCOM certification checked, and engineer-level F-Gas cards evidenced
  • TM44 lodgement number provided, not just a PDF report
  • Maintenance schedule mapped to SFG20 task codes
  • Asset register with age, refrigerant type and charge, and remaining life
  • Duct cleaning quoted with verification method stated up front
FAILURE MODES

Where buildings usually come unstuck

TM44 inspection lapsed or never lodged on the register

Consequence: Fixed penalty, and a gap in the evidence pack at sale or refinance

Fix: Check the lodgement, not the certificate in your file, and re-inspect where it has expired

F-Gas log incomplete or held only by the contractor

Consequence: The operator carries the duty, and cannot evidence it

Fix: Take ownership of the log, with charge quantities and CO2 equivalents recorded per system

Kitchen extract cleaned to a certificate but not to TR19 Grease

Consequence: Insurer declines a fire claim

Fix: Specify TR19 Grease with pre and post verification and deposit measurements

PPM contract with no task list

Consequence: You are paying for attendance rather than maintenance

Fix: Require an SFG20-referenced schedule with asset-level task frequencies

STRAIGHT ANSWERS

HVAC questions buyers actually ask

Do we need a TM44 inspection?

If the building has air conditioning with an effective rated output over 12kW, including multiple smaller units under one control, an inspection is required every five years and the report must be lodged on the central register.

How often do F-Gas leak checks need doing?

Twelve-monthly for systems from 5 to 50 tonnes CO2 equivalent, six-monthly from 50 to 500, and three-monthly above 500. Intervals double where an automatic leak detection system is fitted.

What is SFG20 and why does it matter?

SFG20 is the recognised standard maintenance specification for building services. Contracts written against SFG20 task codes are comparable between bidders. Contracts that are not, generally are not.

How often should ventilation ductwork be cleaned?

It is risk-based under BS EN 15780. Kitchen extract under TR19 Grease is the tightest, ranging from three-monthly for heavy use to annually for light use, and insurers frequently make it a policy condition.

Can the desk price PPM against our existing contract?

Yes. Send the current schedule with the brief and firms will quote on a like-for-like SFG20 basis, which is usually where the real gap shows up.

GO DEEPER

HVAC guides

TM44 Air Conditioning Inspections: Duty Holder Guide
Who needs a TM44, how often, what a Level 3 or 4 assessor covers, the MEES register, and how to close energy performance recommendations.