Electrical learning hub
Electrical Compliance
Electrical Installation Condition Reports (EICRs), remedial works and periodic inspection schedules for landlords, managing agents and commercial duty holders under BS 7671 and the Electricity at Work Regulations 1989.
In short
The Electricity at Work Regulations 1989 require electrical systems to be maintained so far as reasonably practicable to prevent danger. In private rented sector housing, EICRs are mandatory every 5 years. Commercial premises follow BS 7671 recommended intervals.
Legal snapshot
What the law says
- Electricity at Work Regulations 1989
- Duty on employers, self-employed and duty holders to prevent danger from electrical systems.
- BS 7671:2018+A2:2022
- IET Wiring Regulations — 18th Edition including amendments.
- Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020
- 5-yearly EICRs mandatory for private rented housing.
- HSR25 / GS38
- HSE guidance on the Electricity at Work Regs and safe use of test instruments.
On the ground
Common problems & fixes
- EICR classified C1 or C2Fix, C1 is immediate danger — isolate now. C2 must be remediated inside 28 days; a NICEIC or NAPIT contractor issues a Minor Works Certificate on completion.
- EICR older than 5 years in PRS housingFix, Non-compliance with the 2020 Regs; council can serve remedial notices with penalties up to £30,000.
- No fixed wiring test schedule for a commercial buildingFix, Adopt IET Guidance Note 3 intervals — typically 5 years for offices, 3 years for retail, 1 year for temporary installations.
- Recurring nuisance tripping on RCDsFix, Insulation resistance testing and load balancing rather than replacing RCDs like-for-like.
EICR Testing: Frequency, Codes & Remediation Under BS 7671
Electrical Installation Condition Report requirements: legal duties, code classifications (C1/C2/C3/FI), remediation timelines and contractor accreditation.
Read the full guideAll electrical guides
1 guideFAQ
Frequently asked
- How often is an EICR required?
- Every 5 years for private rented housing (mandatory) and at intervals set out in IET Guidance Note 3 for commercial premises — typically 5 years for offices, sooner for higher-risk premises.
- Who is qualified to issue an EICR?
- A competent electrician registered with a UKAS-accredited scheme such as NICEIC, NAPIT or ELECSA, with C&G 2391 (Inspection and Testing) or equivalent.
- What is a C3 code?
- C3 means 'improvement recommended' — the installation is safe but does not meet current BS 7671. C3s do not make an EICR unsatisfactory.